Successful Sale of Prime Industrial Facility in Northampton
We are delighted to announce the successful sale of 5 Upper Priory Street, Northampton, a modern industrial facility with office spa...
Severn Trent Water (STW) are looking to carry out an upgrade of existing treatment sites at Packington, Measham Pump Station, and Measham Treatment Works in Leicestershire.
They are also proposing to install a new 24km pipeline, connecting the three STW treatment sites into a combined transfer pipe and pumping the flows to the River Tame, near the village of Elford in Staffordshire.
We are advised that the purpose of the scheme is to improve the water quality and flow regime of the River Mease, which is a protected watercourse and Site of Special Scientific Interest (SSSI), by effectively providing a ‘bypass’ for the river, so that treated effluent can enter the river system at a less sensitive location.
STW wants to deliver the project by March 2027 and landowner consultations are currently ongoing, alongside the design of the scheme, to ascertain the best route and pipeline parameters.
The new pipeline cuts across a large area of the country and will affect a large number of farmers and landowners. If you have been approached in connection with the scheme and would like further advice as to what the scheme entails, then please do not hesitate to contact amy.simes@howkinsandharrison.co.uk.
If you would like to appoint us as an agent to act on your behalf, STW will cover our agent’s fees in connection with the scheme.
By Amy Simes
"*" indicates required fields