Most of the Birmingham to Leeds leg of HS2 was cancelled in November ‘21, with the publication of the Integrated Rail Plan. The cancelled section ran from East Midlands Parkway to Leeds and was perhaps two thirds of the total length of Phase 2b. The section from Coleshill (North Warwickshire) to East Midlands Parkway however is still due to be built, and probably on very much the current planned alignment. This runs up the M42 corridor, passing Tamworth and Ashby de la Zouch, before joining the existing rail network near Ratcliffe on Soar, and is being called HS2 East.
LESSONS FROM HS2 PHASE 1 AND 2A
There are a number of things that may come as a surprise to those on the HS2 East route when the time comes for their land to be taken:
The other main lesson for those likely to be affected by HS2, and this should be written in foot-high letters above the kitchen door, is GET YOUR HOUSE IN ORDER. This means making sure you have planning permission in place for everything, plus building regulations approvals, listed building consents and any issues on the legal title ironed out well in advance of any notices from HS2 landing on the mat. If you have all that in place, and a good agent, you may stand a chance of coming out of it without losing any hair!
If you need any advice or support, please contact one of our offices. The most appropriate surveyor will talk you through your options and work up an action plan. Whilst we do not know timelines, we urge landowners to act now to be ready with the paperwork when needed.